Elite Excavating LLCEliteExcavating LLC
Aerial view of a parking lot extension being graded beside a paved lot
Demolition · Washington Township

Demolition and Tear-Downs in Washington Township, MI

Washington Township has been turning orchard and farm ground into subdivisions for twenty years. Elite Excavating takes down the pole barns, sheds, garages and decks that are in the way, hauls the debris and grades the ground for what comes next. Free on-site estimates: call George at (989) 702-2426.

  • Free on-site estimates
  • Owner-run by George
  • Based in Capac, MI

Free on-site estimate

Send it over and George calls you back.

Demolition · Washington Township

Demolition in Washington Township

Washington Township grew by half in twenty years

The township went from about 19,000 people in 2000 to over 28,000 in 2020, which makes it the fastest-growing place George works. The growth ran up M-53 and out along 26 Mile Road, onto ground that was orchards and farms a generation ago. Westview Orchards has been here since 1813, and some of its neighbours are now subdivisions.

That history is where the demolition comes from. Every parcel that goes from farm to homesite has something on it that has to go first. And every subdivision built in the first wave now has sheds and decks reaching the end of their life.

The last farm building on a subdivided parcel

When a farm or an orchard is split, the house lot usually keeps the old buildings: a pack shed, an equipment barn, a pole barn with a dirt floor, a chicken house. The new owner wants the barn gone and a shop in its place, or just the view.

George pulls those down with the excavator, loads the debris and hauls it. Floors and footings go in the same visit or stay as a pad. The pole barn pad guide covers what a new building needs underneath it, and that pad can be cut and compacted the same day the old barn comes down.

Newer subdivisions: the shed that came with the house

In the subdivisions built in the nineties and after, the tear-down is smaller: a shed the previous owner put up, a deck that has rotted at the ledger, a play structure set in concrete, an above-ground pool deck. These go quickly, but the posts and footings still have to come out and the lawn still has to be put back.

The compact track loader is the machine for a subdivision lot. It gets through a side gate, works at the back and leaves by the same route. Debris is loaded as it comes down and the tracks are raked out before the job is done.

Township Hall on Van Dyke handles the permit

The township's Building Department and Code Enforcement office is at the Township Hall on Van Dyke. It requires permits for sheds and garages going up, so it is the office to ask before one comes down. Call before a date is fixed and describe the structure. The village of Romeo, which reaches into the township's northeast corner, has its own building office.

MISS DIG 811 marks buried lines at least three business days before digging, which Michigan law requires. The utility shuts off any live power, gas or water to the building before it comes down. Newer subdivisions have a lot of buried services, so the flags matter more here than on a farm lot.

Rolling ground near Stony Creek, flatter to the east

The west side of the township rolls toward Stony Creek and the metropark, where the ground is higher and drains better. The east side flattens out toward Ray Township and holds water like the rest of the clay country. Which one you are on decides how much the last step matters.

Either way, the hole where a slab or footing came out is filled with material that compacts and graded so water leaves. On the flat side, a yard that was wet before the shed came down is a yard drainage in Washington Township question. The machine is already there.

What the footprint becomes

A new barn, usually. The tear-down and the pole barn pad are priced together, with a gravel drive run to it if you need one. Or the footprint goes back to lawn with topsoil and seed, and nobody can tell there was a building.

George gives one figure for the tear-down, the hauling and the grading, and adds the next step if you want it. The rest of what he does in the township is on the Washington Township page. What is and is not taken down is spelled out on the main demolition page.

What it includes

What that covers

  • Orchard and farm buildings. Pack sheds, equipment barns and pole barns cleared off subdivided parcels before the builder arrives.
  • Sheds and decks. Sheds, rotted decks and play structures removed from subdivision lots, posts and footings included.
  • Garages and carports. Detached garages and carports taken apart, loaded and hauled.
  • Slabs and footings. Concrete underneath broken out, the hole filled and compacted, the ground graded for what is next.
Washington Township and nearby

Washington Township and the towns nearby

Washington Township is about 30 minutes south of the yard in Capac, the far end of the Macomb County work, and a subdivision lot gets the same visit as a farm. The same tear-downs run north to Romeo and east to Armada, with Bruce Township, Ray Township and the orchard country between covered on the same terms. The rest of the territory is on the service area page.

How the work actually goes

You get George. Not a crew he sent.

You call

You call. George comes out and looks at the job with you, on the ground, rather than pricing it off a photograph.

A number first

You get one figure before anything starts, with the hauling and the grading in it.

He runs the machine

Then he shows up and runs the machine himself.

Ground left usable

Voids get filled and the ground is graded back so you can pour, build or seed.

On the ground

Photos of his work.

These are photographs from actual jobs. See more recent work. Or read about the full demolition service.

Yard and treeline after the ground was cleared and graded
Aerial view of a cleared and graded lot between houses on a residential street
Aerial view of a cleared and graded lot between houses on a residential street
Lot graded to bare soil beside a white fence
Lot graded to bare soil beside a white fence
Who do I call about a demolition permit in Washington Township?

The township's Building Department and Code Enforcement office at the Township Hall on Van Dyke. Call them before a date is fixed and describe the structure. If the property is inside the village of Romeo, the village has its own building office and a historic district commission.

Can you take down the old barn and put in the pad for the new one?

Yes, and that is the usual job. The barn comes down and is hauled, the old floor goes or stays, and the pad for the new building is cut, filled and compacted the same day. It is priced as one figure with the hauling in it.

Will the machine fit through my subdivision gate?

The compact track loader is built for that. George checks the gate, the side yard and anything overhead at the estimate. Debris comes out the same way the machine went in, and the tracks are raked out before he leaves.

What about the concrete footings under a deck?

They come out. Deck posts here are set in concrete below the frost line, and each footing is dug and pulled rather than left in the lawn. The holes are filled and the ground is graded back as part of the job.

Does the ground drain afterwards?

The footprint is filled with material that compacts and graded so water leaves. On the flatter east side of the township the clay holds water, so if the yard was wet before the building came down, drainage is worth pricing while the machine is there.

Free estimate

Free estimate in Washington Township.

Send the details and he will come out, walk the job with you and give you a number before anything starts. If it is easier to talk it through, call him.

Capac, Michigan · St. Clair, Lapeer and Macomb counties

Free on-site estimate

Send it over and George calls you back.

Need demolition in Washington Township?

Call George. He walks the job with you and gives you a price before any work starts.

Call GeorgeFree Estimate